精品人妻少妇嫩草AV无码专区,久久久久久国产精品无码下载,成全看免费观看,久久久噜噜噜久久中文福利

          Welcome to Dongguan Lisheng Electromechanical Equipment Co., Ltd.

          ? Hotline:400-8385-889
          News

          Hotline:400-8385-889
          Tel:0769-85656916
          Wang:Sheng 13751350708
          Chuang:Sheng 13712951855
          Fax:86-0769-85656926
          E-mail:ls@dglisheng.com
          Website:www.xie-chuang.com
          Room 203, No. 45, Lianma Road, Dalingshan Town, Dongguan City  
          FAQ
          How can an enterprise improve its production efficiency? How should it optimize its assembly line?
          Visit:4606 Date:2019-07-11
          Optimize the operation time of the first station of the assembly line, and how long to put a board, which is the investment time necessary to meet the production plan. But in fact, the operation time of the bottleneck station is inevitably larger than the first station. The first station must not be the bottleneck station, so the first station may not be fully invested according to the required time, because the bottleneck station has slowed down his speed. Therefore, from the perspective of management, it is necessary to require the first station operator to invest at the prescribed speed. The conveyor belt speed of the assembly line can also be used to calculate the daily output. The following is the formula for the conveyor belt speed:

          Pitch time of the conveyor belt = working time / daily output of the whole day * (1 + non-performing rate)

          Conveyor speed = mark separation distance / pitch time of the conveyor belt

          The so-called mark separation distance, the distance between the marks made on the belt of the pipeline, the operator is expected to complete the work according to the speed at which the mark flows and placed on the belt line, but the refining line is not marked, the length of the board is used. As the mark separation distance. Why use a conveyor belt?

          In addition to transporting items, there are also semi-mandatory operators who perform the functions of the work according to the plan, but instead of speeding up the trial, they should be calculated according to the above formula.

          Links
          Dongguan Lisheng Electromechanical Equipment Co., Ltd.    Dongguan Lisheng Electromechanical Equipment Co., Ltd. 
          Home | Assemblyline | 智能分揀吊掛系統 | Products | Successful cases | News | About Us | Contact Us |

          Hotline: 400-8385-889
          Tel:0769-85656916
          Wang:Sheng 13751350708
          Chuang:Sheng 13712951855
          Fax: 86-0769-85656926
          E-mail:ls@dglisheng.com
          Website: www.xie-chuang.com
          Add:Room 203, No. 45, Lianma Road, Dalingshan Town, Dongguan City

          Alibaba

          Wechat
          CopyRight ? 2019 Dongguan Lisheng Electromechanical Equipment Co., Ltd. All Right Reserved. 粵ICP備17115331號
          展開
          • QQ咨詢

          • 電話咨詢

          • 400-8385-889
          QR CODE
          回到頂部 精品人妻少妇嫩草AV无码专区

                  青青河边草直播免费观看| 久久久久久精品一级| 精品久久久久中文字幕APP| 小小影视大全在线观看电视剧免费| 男女无遮挡xx00动态图120秒| 亚洲男人天堂| 三年片在线观看免费观看大全| 免费av在线| 國產精品18久久久久久麻辣| 精品视频|